Tramways
owner
geneva construction department
urbanisation division, railway division and bridge division
project
urban integration project for the rapid transit system from cornavin railway station to the cern in geneva
project realised by a multidisciplinary team managed by zs civil engineers sa
scope of work of T ingénierie sa
T ingénierie sa has taken part to the whole project development, doing approx. 35% of the total work. T ingénierie sa has especially worked on the bridges supporting the new line, as well as on the footbridges crossing it
specifications
construction of a new tramway line in urban site including all the road beds, the civil engineering and the following bridges :
- avanchet footbridge
- refection of the étang underpass
- refection of the blandonnet underpass
- prébois bridge
- valombré bridge (widening and reinforcement)
- coquelicôt footbridge (replacement)
- lect viaduct
schedule
project 2000-2006
construction 2007-2009