Projects

owner

geneva construction department

project

  • direct connection of the tramway lines between the riantbosson and meyrin village stations in geneva
  • length approx. 1 km
  • replacement of the feuillasse concrete bridge
  • project realised by a multidisciplinary team managed by zs civil engineers sa

scope of work of T ingénierie sa

T ingénierie sa has realised 2/3 of the overall design
concerning the development project, civile and rail
engineering, as well as 100% of the bridge
replacement

specifications

the new tramway line project connecting geneva to meyrin needs to be completed by a straight bypass line that will allow to reduce the journey time for the passengers going from fance and the cern to downtown geneva

schedule

construction 2009 - 2010