owner

construction and information technologies department of geneva district - switzerland

project

  • highway crossing of lake geneva with a high bridge
  • general ring concept with 6.5 km tunnels on one side and underwater shoring on the other side

T engineering tasks

  • conceptual design
  • faisability studies
  • preliminary studies with foundation conceptsm,
  • statical and dynamical pre-design

structural description

  • total length of the crossing: 4.5 km
  • multispan cable stayed bridge on a total length of 3’000 m with 450 m spans
  • suspended alternative - main span 1’300 m

calendrier

studies 2010-2011