owner
construction and information technologies department of geneva district - switzerland
project
- highway crossing of lake geneva with a high bridge
- general ring concept with 6.5 km tunnels on one side and underwater shoring on the other side
T engineering tasks
- conceptual design
- faisability studies
- preliminary studies with foundation conceptsm,
- statical and dynamical pre-design
structural description
- total length of the crossing: 4.5 km
- multispan cable stayed bridge on a total length of 3’000 m with 450 m spans
- suspended alternative - main span 1’300 m
calendrier
studies 2010-2011