owner
direction generale de l’equipement et du transport du grand casablanca
project
- improvment of the sidi maarouf crossring in the center of casablanca (11’000 veh/hour)
- implementation of the tramway line
- conceptual and detailed design of a cable stayed bridge over the crossring - total length 225 m
- conceptual and detailed design of the complete crossring with underpasses, cut and cover tunnels, considering the traffic during the entire work
- preparation of the tender documents
design team: T ingenierie, greisch (liège), team maroc (rabat) and f. zirk architect
T engineering tasks
- project management
- conceptual and detailed design of the cable stayed bridge
- coordination of traffic studies
- construction cinematic
- preparation of tender documents
structural description
- double rundaround with underpasses
- asymetrical cable stayed bridge with inclined pylon, main span 140 m bac span 50 m
- central and unique stay fan in the main span, lateral stays in back span with counterweight abutment
- composite deck with central steel box and concrete slab, concrete pylon
timeframe
- conceptual and detailed design 2009-2010
- construction 2014 - 2016