owner
state of geneva
department of public works
buildings division
project
design of a new elevated railway station, located in the middle of the au milieu du réseau des voies de la gare de genève
scope of work of T ingénierie sa
conceptual design, construction design and project management for the platform and the elevated steel structure
specifications
- elevated steel footbridge with central circular builtin columns
- elliptical steel structure made of bent laminated profiles, steel and polycarbonate cover
- total length : 190 m
- severe work and service conditions due to the proximity of the railway lines clearence limits
- severe security conditions during construction due to the proximity of the operating railway lines
schedule
construction : 2003 – 2004