owner
- geneva construction department
- urbanisation division and bridge division
project
Urban integration project for the rapid transit system from cornavin railway station to the cern in geneva.
Project realised by a multidisciplinary team managed by zs civil engineers sa.
scope of work of T ingénierie sa
Conceptual design of all new bridges and modification of all existing structures required by the new line layout.
Specifications
- single span pedestrian footbridge crossing the a main road with a tramway line in geneva total length 34 m
- the project allows a connection between two districts separated by the main road
- slender arch footbridge made of steel trusses without any upper bracings
- deck made of concrete cast on prefabricated concrete slabs
scheduler
Construction 2008