owner
bangkok metropolitan administration - department of public works
project
- design and build competition
- development of two design alternatives for the contractor group chor-karnchang, public company limited (bangkok) and hitachi zosen corp. (japan)
- work done in association with scandiaconsult international (stockholm), arun chaiseri engineering and sea consult (bangkok)
- competition result : 2nd
scope of work of T ingénierie sa
consultant organisation :
- project management and conceptual design of the approach spans: scandiaconsult international
- conceptual design of main bridge: T ingénierie sa
- foundations: arun chaiseri
- road works and local coordination: sea consult
specifications
- . asymetrical cable stayed bridge over the chao prahia river, in the historical center of bangkok
- . architectural and urbanistic integration study
- . 5 km of elevated road as approach bridge
- . cable stayed bridge: inverted y pylon, main span 300m balanced by a very short side span with counterweight (160 m)
- . first alternative includes a composite cross section with lateral suspension
- . second alternative present a steel box girder with central suspension
- . global estimated costs (approach + main bridge) : approx. chf 120’000’000 .-
schedule
competition 1998
construction 2000-2003 with australian group of