Projects

owner

Hall 6 foundation

project

roof of hall 6 and the convention centre

steel structure composed of triangulated girders supported by 4 reinforced concrete towers

from 01.01.2011, babeling.sa joined tingénierie sa

Babelingénieurs sa services

  • member of the renaud pool, competition winner
  • study and execution of hall 6 load-bearing structures

specifications

  • ground erection of framework (22,800m²), laying of insulation and impermeabilization, erection of monobloc casting ventilation.
  • lifting of framework to 18m(5,500t)and setting it onto 4 reinforced concrete towers
  • connecting roof between halls 5 and 6 (5,500m²)
  • total area: 28,300m2

schedule

2000-2004