Projects

owner

Sarine- Campagne and Haut-Lac Français middle school association

Architects: Simonet et Chappuis architectes

project

construction of a school complex including gymnasium and auditorium.

T ingénierie sa services

  • joint mandate with the engineering firm Brasey SA
  • full engineering services as specialised engineer according to sia 103 art. 4.2

specifications

  • whole building in exposed sand-blasted concrete slabs connected to the wall using dowels
  • open-worked load-bearing façades
  • net floor area 10,400m2
  • max. length 140m
  • max width 70m
  • minergie © standard building

schedule

construction:  2004 - 2007