Buildings
owner
DCTI (construction and IT department)
project
construction of a steel structure to support the head's new 4-storey (h14m) building above the hepia gymnasium
from01.01.2011,babeling.sajoinedt ingénieriesa
Babel ingénieurs SA services
full range of engineering services as specialised engineer according to sia 103 art. 4.2
specifications
steel structure composed of 6 welded-built up steel beam sections supporting the load of the new building and built on 4 supporting points with an overhang at the end.
dimensions:
- length: 52.70
- width: 12.50
max load on support: 27 tonnes
schedule
2010